| South Africa |
 |
|
|
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Paving at Johannesburg Zoo |
S A Paving |
R 0.25 m |
| Paving at Orchids Substation |
ESKOM |
R 0.075m |
| Paving rehab Charlemagne Townhouses |
Man Commitee |
R 0.20 m |
| Parking Area, Alberton City |
Rapp & Meister |
R 0.25 m |
| Roads and Services |
German Church |
R 0.24 m |
| Earthworks at Vereeniging |
S A Breweries |
R 0.25 m |
| Petroport Service Station |
Total S A |
R 0.40 m |
| Terrain Works at Hera Substation |
ESKOM |
R 1.50 m |
| Skid pan at Kyalami |
AAKDT |
R 0.60 m |
| Terrain Works for ESKOM Housing |
ESKOM |
R 9.00 m |
| Retaining walls at PTA Academic Hospital |
CSI |
R 1.00 m |
| Terrain Works at Trek Northgate |
Trek Petroleum |
R 0.50 m |
| Terrain Works Service Station, Sundowner |
BSD Properties |
R 0.25 m |
| Terrain Works Filling Station, Rustenburg |
Dr A Meyer |
R 1.20 m |
| Terrain Works at Kliptown Shopping Centre |
VZADK |
R 0.00 m |
| Terrain Works at Rietfontein Development |
Guvon Beleggings |
R 0.30 m |
| Terrain Works at Drieziek Service Station |
Total S A |
R 1.30 m |
| Midrand Clusters |
Target Development |
R 0.45 m |
| Gaborone Showground Parking |
L+M Consultants |
R 1.80 m |
| Cheetah Inn Golf Course |
Cheetah Inn |
Investigation |
| Terrain Works at Engen Prinshof |
Engen Marketing |
R 0.80 m |
| Lyttleton Manor Ext 1 |
JvG Consultants |
R 0.18 m |
| Gabs Agricultural |
L+M Consultants |
R 0.50 m |
| Fourways Service Station |
Zenex |
R 0.60 m |
| Engen |
RAU |
R 3.00 m |
| RAU Phase I |
RAU |
R 1.50 m |
| Hill St/Rocky St Development |
GIP |
R 1.30 m |
|
Back to Top
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Orange Farm Shopping Centre |
Business Multisource |
R 2.50 m |
| Deep Meadow |
Nkosana Investment |
R 0.10 m |
| Lokothwayo Centre |
Rescue Homes |
R 0.20 m |
| Service station, canopy & earthworks - Engen Fochville |
K Etsebeth |
R 0.75 m |
| Tembisa Access Road Bridge |
Gauteng Prov Govern |
R 6.00 m |
| Rehabilitation of Koedoskop Bridge |
NPRA |
R 3.00 m |
| Low-level bridge Thabazimbi |
NPRA |
R 2.70 m |
|
Back to Top
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Gateway Mobil Service Station |
WPW |
R - |
| Stands 64, 65 + 70 North Riding |
Ferreira's |
R - |
| 2 Oscar Street |
S A Paving |
R 0.01 m |
| Erf 672 Twala, Katlehong |
Dan Fourie |
R 0.50 m |
| Geotech & Flood lines Wilgespruit |
Rabie Properties |
Investigation |
| Trek Midrand - Geotech |
Trek Petroleum |
Investigation |
| Aanwins/Amarosa |
J Glowacki |
Investigation |
| Veld en Vlei Motors |
K Naude |
Investigation |
| Holding 31 Golden Harvest |
Zenex Oil |
Investigation |
| Panorama 66 |
Steyn & Pienaar |
Investigation |
| Plot 37 Bromhof |
Vanroux Construction |
Investigation |
| Portion 343 Paardeplaats 177 |
IQ Steyn & Evans |
Investigation |
| Erf 171 Ruimsig X6 |
Piet Ferreira |
Investigation |
| Ptn 173 Roodepoort 237 |
IQ Marischa cc |
Investigation |
| Irene Ext 10 Dolomites |
JST |
Investigation |
|
Back to Top
|
| |
| Transportation and Traffic |
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Erf 699/700 Fontainebleau |
Titan Construction |
R - |
| Proposed Service Station Sebokeng |
VZADK |
Investigation |
| Proposed Service Station Boksburg |
A Meyer |
Investigation |
| Service Station Bloemfontein |
Metrotech |
R 0.25 m |
| Westgate Access application |
Mr Pieterse |
R - |
| Traffic Counts Sutherland |
S van der Westhuizen |
R - |
| Rabie Orange Farm Site |
Rabie Properties |
R - |
| Cato Ridge Traffic Studie |
T R P C |
R - |
| Portion I Allandale |
C Metcalfe |
R - |
| Erf 946 Fairland |
V Z A D K |
R - |
| Boundary Park |
R Fuller |
R - |
| Holding 31 Golden Harvest |
Zenex Oil |
R - |
| Service Station/Motor Dealership-Linksfield Road |
Julius Lecuona |
R - |
| Motortown Detroit Plaza - Pretoria Rd,Kempton Park |
TAPP |
R - |
| Kwadakuza Lodge - Noise study |
Kwadakuza Lodge |
R - |
| Traffic impact studies for over 100 various types of developments,including residential, commercial,offices and retail |
Various Developers |
R - |
| Planning and preliminary design of the Pan Africa Taxi Rank (Alexandra) |
City of Johannesburg |
R - |
| Planning, design and supervision of The Oakmoor Taxi Rank (Kempton Park) |
Ekurhuleni |
R - |
| Design of traffic signal plans for over 20 intersections in the Johannesburg area |
JRA, Individual Developers |
R - |
|
Back to Top
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Services for Kya Sand Ext |
Owners |
R 2.00 m |
| Protea South |
VZADK |
R 2.40 m |
| Township Services Stand 153 North Riding |
Ferreira's |
R 0.30 m |
| Services at Orlando East |
WPW |
R 0.60 m |
| Township Services Stand 81 North Riding |
Ferreira's |
R 0.45 m |
| Township Services at Carolina |
RSCO |
R 0.36 m |
| Township Services at Protea North |
Z Z Design |
R 5.80 m |
| Air Botswana Housing |
L+M Consultants |
R 6.00 m |
| Gaborone Township (Botswana) |
Long Homes |
R 2.30 m |
| Orlando Railway Village |
Interlink |
R 0.35 m |
| Sunninghill Ext 74 |
Target Development |
R 0.25 m |
| Wilgeheuwel Extention 1 |
Ferreira's |
R 1.00 m |
| Infrastructure Meyersdal Ext 19,20+21 |
RPD Projects |
R 2.00 m |
| Roads & Stormwater Avalon Cemetery |
Soweto City Council |
R 3.00 m |
| K105 Oakmoor Taxi Rank |
KMC |
R 7.00 m |
| Kaalspruit Outfall Sewer |
MMLC |
R 00 m |
| Multi Purpose Precinct, Ivory Park I |
VII MMLC |
R 8.50 m |
|
Back to Top
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Labour Based Roads Ivory Park Phase 1- 8 |
Midrand Town Council |
R 18.00 m |
| Mpondonde Street, Pimville Ext 7, Soweto |
Soweto City Council |
R 0.35 m |
| Molope Street, Phase I - III, Naledi Ext |
Soweto City Council |
R 0.75 m |
| Labour Based Work at Kaalfontein Sewer |
Midrand Town Council |
R 1.20 m |
| Zamukulungisa Street, Emdeni, Soweto |
Soweto City Council |
R 0.34 m |
| Nakeli + Moswe Street, Emdeni, Soweto |
Soweto City Council |
R 0.30 m |
| Tembisa Stormwater - Labour Based |
Edenvale MSS |
R 0.75 m |
| Sipu, Mmutla + Mokgoronyane St, Klipspruit |
Soweto City Council |
R 0.25 m |
| Rimbelule Street, Klipspruit, Soweto |
Soweto City Council |
R 0.25 m |
|
Back to Top
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Basic Planning of K105 |
Gautrans |
R 3.00 m |
| N4 - Maputo Development Corridor |
SNA/SBB |
R 5.00 m |
| Jwaneng-Sekoma Road Rehab |
Botswana Roads Dept |
R 0.00 m |
| Estrada Nacionale 223 Road Rehab |
DNEP |
R 25.00 m |
| Coal Haul Road Design |
Rand Mines |
R 0.95 m |
| 69 km Road in Botswana |
ZMCK |
R 9.00 m |
| Review Consultant on various road projects |
SA Development Bank |
R - |
| Pungwe River Crossing (Mozambique) |
DNEP |
R 2.00 m |
| Koma Street Phase 1 |
Soweto City Council |
R 7.00 m |
| Road K15 Basic Planning |
TPA Roads Dept |
R 30.00 m |
| Orange Farm Shopping Centre |
Business Multisource |
R 2.50 m |
| Kanye Road Project, Botswana |
CPP |
R 15.00 m |
| Van Dyksdrift Roads |
Randcoal |
R 1.00 m |
| Buchwa - Sango |
CPP |
R 30.00 m |
| Basic Planning of K144 |
TPA Roads Dept |
R 30.0 m |
| Beit Bridge Access Road |
CPP |
R 1.60 m |
| Upgrading of Judges Road |
Randburg Town Council |
R 0.37 m |
| Detail design of roads in Dobsonville |
GJMC |
R 3.00 m |
| K105 Tembisa Access Road |
Gauteng Prov Govern |
R 15.00 m |
| Rehabilitation of P110-1, Thabazimbi |
NPRA |
R 2.10 m |
| Repair Flood Damage Bridges, Thabazimbi |
NPRA |
R 3.60 m |
| Maintenance of rural road, Rooiberg |
NPRA |
R 0.30 m |
| Repair & Reseal of P1-3 (5 km), Warmbaths |
NPRA |
R 0.30 m |
| Regravel of district roads, Potgietersrus |
NPRA |
R 1.70 m |
| Rehabilitation Selebi-Phikwe to Sefophe |
Botswana Rds Dept |
R 23.00 m |
| Redesign of rehabilitation for Phalapye-Serule |
Botswana Rds Dept |
R 43.00 m |
|
Back to Top
|
| |
|
|
| PROJECT NAME |
CLIENT |
PROJECT VALUE |
| Parmalat Gauteng - New distribution Centre |
Moolman Group |
R 0.40 m |
| Stanford Gardens Phases 1 - III |
Lethabong Housing |
R 0.60 m |
| Pioneers Park : Masterplan |
Jhb City Parks |
R 0.20 m |
| Pioneers Park Upgrading of existing park |
Jhb City Parks |
R 0.80 m |
| Pioneers Park Upgrading of existing park (Phase 2) |
Jhb City Parks |
R 10.10 m |
| Rhodes Park Upgrading of existing park |
Jhb City Parks |
R 1.00 m |
| Contract administration & supervision 6 x park projects |
Jhb City Parks |
R 2.15 m |
| Pieter van Niekerk : Waterkloof Landscape upgrading & supervision |
Larella Investments |
R 0.80 m |
| Diepsloot Sport Precinct |
City of Joburg |
R 0.50 m |
| Sasol Limited : Head Office Landscape upgrading |
Sasol Limited |
R 1.35 m |
| McDonald's S.A. All landscape planning |
McDonald's S.A. |
R 5.50 m |
| Jan Erasmus Landscape planning |
Starry Sky Trust |
R 1.20 m |
| Multi Purpose Sport Precinct |
City of Joburg |
R 3.70 m |
| Thuthukani Sport Precinct |
Midrand Council |
R 1.50 m |
|
Back to Top
|
| |
|
|
|
GMH/CPP Consulting Engineers were responsible for all the paving aspects of the mentioned landscaping architecture work as well as various other specific paving orientated projects such as labour intensive road construction and more recently the sidewalk upgrading project in Soweto.
|
Back to Top
|
| |
 |
Pavement rehabilitation design and construction supervision of 322 km of road in Free State Province following inadequate funding of road infrastructure for several years. Repair measures included heavy patch work and in-situ bituminous and chemical stabilisation of existing base layers followed by surfacing seal. Provincial Government. (Complete December 2001). |
| |
 |
Road pavement rehabilitation and construction supervision of 15 km of road in Limpopo Province. Project included chemical stabilisation of subbase and construction of crushed stone base followed by a double surfacing seal and limited asphalt surfacing. Provincial Government (Complete August 2002). |
 |
| |
 |
Route location, design and construction supervision of approach roads and post tensioned bridge over railway lines into Tembisa township in Gauteng Province. Bridge comprised vertical and horizontal curvature and founding conditions complicated by 40 m deep horizon of compressible silts. Relocation of existing water reticulation added further interesting aspects to the project. Provincial Government (Completion January 2004). |
|
|
| |
 |
Detailed Design and Supervision of Construction of various projects forming the World Summit Civil Infrastructure Project. The sites are spread over numerous sites in Greater Johannesburg and time was limited. United Nations and National Government (Complete July 2002). |
|
|
| |
 |
Design, tender and construction supervision for rehabilitation of flood damaged low-level bridge over the Crocodile River (feeding the Limpopo River) in the Limpopo Province. Project included rebuild of 4km of approach roads. Provincial Government. (Complete 2001). |
 |
| |
 |
JRA Gravel road upgrading project. We are part of this upgrading of gravel roads project for the past four years and as a result succeeded in tarring all the roads in Soweto by the end of 2005. |
 |
| |
 |
Road D374 will be upgraded to surfaced standards over a length of almost 10km’s to fulfill it’s crucial road hierarchy function within the Cradle of mankind world heritage site. |
 |
Back to Top
|
| |
| Botswana |
 |
|
 |
Design and supervision of construction of a dual carriageway of length 8 km, including a road/rail flyover bridge, at Kudumatse Drive in Gaborone, Botswana. BRD. |
| |
 |
Design and supervision of the rehabilitation of the Palapye - Serule Road of length 71 km in Botswana, to be followed by the design and supervision of a parallel new carriageway and two bridges. Botswana Government. |
| |
 |
Design and supervision of construction of an overlay for the Sefophe - Selebi Phikwe Road of length 33 km in Botswana. Botswana Government. |
| |
 |
Design and supervision of construction of the Motloutse River Bridge and approach roadworks near Tobane in Botswana. Botswana Government.. (Complete Nov.2001). |
| |
 |
Design and supervision of construction of the Molepolole - Thamaga and Boatle - Mankgodi Roads of combined length 71 km, including 4 bridges, in Botswana. BRD. (Complete March 2001). |
| |
 |
Design and supervision of the widening and rehabilitation of the Sebina - Tutumi Road of length 71 km, including 1 bridge, in Botswana. BRD. (Complete September 2001). |
| |
 |
Investigation into flooding, design of upgraded drainage works, and supervision of construction within four villages in Botswana. BRD. (Complete December 2000). |
Back to Top
|
| |
| Lesotho |
 |
|
 |
Design of the Senqunyani River Bridge in Lesotho. EDF and Republic of Ireland. (Complete 1999).
|
Back to Top
|
| |
| Malawi |
 |
|
 |
Investigation into the breaching of the road/rail embankment by flooding at Chiromo in southern Malawi and detailed design of the replacement drainage structures. NRA (Complete August 2001). |
 |
| |
 |
Design of a new bridge across the Dwambazi River in Malawi. NRA.(Complete June 2000). |
 |
Back to Top
|
| |
| Mozambique |
 |
|
 |
Supervision of Construction of Primary Teachers' Training Centres in Pemba, Cabo Delagdo Province and Vilunkulo, Inhambane Province, Mozambique. |
| |
 |
Design and supervision of construction of the Zandamela - Maxixe Road of length 170 km and including 1 bridge in Central Mozambique under World Bank funding and the design and supervision of a 40 km access road to carry 150 tonne road trains from a mine near Maxixe to the sea in the same area. |
 |
| |
 |
Supervision of the rehabilitation of 16 roads comprising 4 contracts and totalling 1100 km, including 5 Bailey Bridges and 9 RC bridges in the Cabo Delgado Province of Mozambique. World Bank. |
| |
 |
Road condition survey of 7 roads of combined length 790 km in the Sofala Province of Mozambique following flood damage during 2000/2001. |
 |
| |
 |
Design and supervision of the rehabilitation of the Vanduzi - Changara Road of length 270 km in Mozambique, including the widening, repair and strengthening of 49 bridges. ADB. (Design Review complete 2000, supervision contract awarded in 2001). |
 |
| |
 |
Investigation into the defects in the Zambezi River Suspension Bridge of length 720 m in Tete Moçambique World Bank. (Investigations and design complete 1999, supervision pending). |
 |
 |
Detailed Design and Supervision of Construction of a Primary Teachers' Training Centre in Matola, Maputo, Mozambique (Complete 2000). |
|
|
| |

|
Design of the rehabilitation the of the EN 223 road of length 170 km, including the completion, repair and strengthening of 12 bridges, in Tete Province of Moçambique. World Bank. (Complete 2000). |
 |
| |
 |
Design of the Matola Road Interchange, Matola Road/Rail grade separation structure and 4 footbridges as part of the Maputo Development Corridor Project. BOT Project. (Complete 1999) |
 |
| |
 |
Design and Supervision of Construction of a Bottling Plant for Coca Cola (Sabco) (Pty) Ltd in Mozambique. (Complete 1997) |
 |
| |
 |
Design and production of Tender Documents for Provincial and rural Hospitals and Health Centres in the Nampula, Niassa and Cabo Delgado Provinces of Mozambique (Complete 1997). |
 |
Back to Top
|
| |
| Zimbabwe |
 |
|
 |
Detailed Design and Supervision of construction of a new bridge across the Limpopo River at Beit Bridge on the Border of Zimbabwe and South Africa. BOT Project. (Construction complete 1996, annual maintenance inspections ongoing from 1997 to 2001). |
 |
| |
 |
Design and supervision of construction of the Seruwe River Bridge on the Ngezi - Selous Road in Zimbabwe. BOT project. (Complete July 2001). |
| |
 |
Investigation into the collapse by flooding (Cyclone Eline) of the Chipangayi River Bridge on the Ngundu - Tanganda Road in eastern Zimbabwe and design of the replacement bridges. MoT. (Design complete 2001, supervision pending). |
 |
| |
 |
Investigation into the collapse by flooding (Cyclone Eline) of the Nyautsa River Bridge on the Ngundu - Tanganda Road in eastern Zimbabwe and design of the replacement bridges. MoT. (Design complete 2001, supervision pending). |
| |
 |
Design and supervision of construction of the Mupfure River Bridge on the Ngezi - Selous Road in Zimbabwe. BOT project. (Complete July 2001). |
| |
 |
Design and supervision of construction of the Muzvezwe River Bridge on the Ngezi - Selous Road in Zimbabwe. BOT project. (Complete July 2001). |
| |
 |
Design and supervision of construction of the Ngezi - Selous Platinum Mine Road of length 70 km to take 150 t road trains. BOT project. (Complete December 2001). |
| |
 |
Design of Bvumvudzi River Bridge on Alaska - Copper Queen Road in Zimbabwe. BADEA. (Complete 1999). |
| |
 |
Design of 4 bridges in the City of Harare including interchanges and road/rail grade separation structures. City of Harare. (Complete 1999). |
 |
Back to Top
|
| |